Device Stands - Square Flanged (Part Numbers - CAD Download)

Device Stands - Square Flanged
  • Promotional pricing ends 31/12/2024
  • Volume Discount
  • Order quantities extended (D-JIT)
  • Stock

(i)Remark

  • Please check the content on our website as the PDF does not contain the most up-to-date information.

Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

Device Stands - Square Flanged:Related Image

■Sets (Posts + Brackets)
TypePostBracketAccessory
Square FlangedSquare Flanged, Dowel Holes
SolidHollowSolidHollowMaterial HardnessSurface TreatmentMaterialSurface TreatmentSolidHollow
ASTNASTAASPNASPAEN 1.1191 Equiv. Induction Hardened-EN-JL 1040 Equiv.Black oxide or Phosphate Conversion CoatSet Screw
Hex Socket Head Screw
Set Screw
Hex Socket Head Screw
Cap
(P.2143)
MASTNMASTAMASPNMASPAEN 1.1191 Equiv.Electroless Nickel Plating
KASTNKASTAKASPNKASPABlack Oxide
SASTNSASTASASPNSASPAEN 1.4301 Equiv.-
ASTNMASTAM--EN 1.1191 Equiv. Induction HardenedElectroless Nickel PlatingEN-JL 1040 Equiv.Electroless Nickel Plating
MASTNMMASTAMEN 1.1191 Equiv.
SASTNMSASTAMEN 1.4301 Equiv.-
* Case Induction Hardened (Post): 58HRC ~, Depth 1.0 ~ 1.5
* There may be no electroless nickel plating and black oxide at ends and grooves of posts.
* For Hex Socket Head Cap Screws, a black oxide bracket matches a black oxide screw, and an electroless nickel plating bracket matches a trivalent chromate screw.
* Dowel Hole Type includes dowel pins.

■Bracket only
Type
Material
Surface TreatmentAccessory
No Dowel HoleWith Dowel HolesNo Dowel HoleWith Dowel Holes
ASTFASPFEN-JL 1040 Equiv.Black oxide or Phosphate Conversion CoatSet ScrewSet Screw
Dowel Pin (EN 1.3505 Equiv.)
ASTFM-Electroless Nickel Plating

Specifications

Part Number-L
ASTN40
ASTF20
-400
Part NumberL
1mm
Increment
ABFGD1HTKJM(d)Bracket with Dowel Holes[ A ]Accessories
Hex Socket Head Cap Screws
(Available as Set Only)
TypeDPostsg6BracketsH7PH7 Included Dowel Pin (2 pcs.)
Tolerance m6
Tolerance
Set10-0.005
-0.014
+0.015
0
50~25056304014263512184.511M46---M4-20x4 pcs.
(Solid)
ASTN
MASTN
KASTN
SASTN
ASTNM
MASTNM
SASTNM

(Rods with Dowel Holes)
ASPN
MASPN
KASPN
SASPN
(Hollow)
ASTA
MASTA
KASTA
SASTA
ASTAM
MASTAM
SASTAM

(Pipe with Dowel Holes)
ASPA
MASPA
KASPA
SASPA
12-0.006
-0.017
+0.018
0
50~30062364418283512185.513M46---M5-20x4 pcs.
15-0.006
-0.017
+0.018
0
75~35070405020314012206.615M510---M6-25x4 pcs.
20-0.007
-0.020
+0.021
0
75~40080506030404512256.615M511.76
+0.012
0
MSTM6−20M6-25x4 pcs.
25-0.007
-0.020
+0.021
0
75~45010060753645501230918M615.28
+0.015
0
MSTM8−20M8-25x4 pcs.
30-0.007
-0.020
+0.021
0
100~45010660803650601230918M6168
+0.015
0
MSTM8−20M8-25x4 pcs.
Separate Item35-0.009
-0.025
+0.025
0
125~500118809040557015401120M820.110
+0.015
0
MSTM10−30M10-35x4 pcs.
Bracket only
ASTF
ASTFM
Bracket only with Dowel Holes
ASPF
40-0.009
-0.025
+0.025
0
150~500125809540608015401120M822.710
+0.015
0
MSTM10−30M10-35x4 pcs.
50-0.009
-0.025
+0.025
0
200~600140100106507010015501424M1030.810
+0.015
0
MSTM10−30M12-35x4 pcs.
[ ! ]Bracket ASPF with Dowel Holes is available from D20. [ ! ]For available sizes of the brackets, refer to the price list.

Alterations

Device Stands - Square Flanged:Related Image

Part Number:  

    3D preview is not available, because the part number has not yet been determined.

  • In order to open the 3D preview, the part number must be fixed.
Loading...
Part Number
MASPA25-[75-450/1]
MASPA30-[100-450/1]
MASPA35-[125-500/1]
MASPA40-[150-500/1]
MASPA50-[200-600/1]
MASPN20-[75-400/1]
MASPN25-[75-450/1]
MASPN30-[100-450/1]
MASPN35-[125-500/1]
MASPN40-[150-500/1]
MASPN50-[200-600/1]
MASTA10-[50-250/1]
MASTA12-[50-300/1]
MASTA15-[75-350/1]
MASTA20-[75-400/1]
MASTA25-[75-450/1]
MASTA30-[100-450/1]
MASTA35-[125-500/1]
MASTA40-[150-500/1]
MASTA50-[200-600/1]
MASTAM10-[50-250/1]
MASTAM12-[50-300/1]
MASTAM15-[75-350/1]
MASTAM20-[75-400/1]
MASTAM25-[75-450/1]
MASTAM30-[100-450/1]
MASTAM35-[125-500/1]
MASTAM40-[150-500/1]
MASTAM50-[200-600/1]
MASTN10-[50-250/1]
MASTN12-[50-300/1]
MASTN15-[75-350/1]
MASTN20-[75-400/1]
MASTN25-[75-450/1]
MASTN30-[100-450/1]
MASTN35-[125-500/1]
MASTN40-[150-500/1]
MASTN50-[200-600/1]
MASTNM10-[50-250/1]
MASTNM12-[50-300/1]
MASTNM15-[75-350/1]
MASTNM20-[75-400/1]
MASTNM25-[75-450/1]
MASTNM30-[100-450/1]
MASTNM35-[125-500/1]
MASTNM40-[150-500/1]
MASTNM50-[200-600/1]
SASPA20-[75-400/1]
SASPA25-[75-450/1]
SASPA30-[100-450/1]
SASPA35-[125-500/1]
SASPA40-[150-500/1]
SASPA50-[200-600/1]
SASPN20-[75-400/1]
SASPN25-[75-450/1]
SASPN30-[100-450/1]
SASPN35-[125-500/1]
SASPN40-[150-500/1]
SASPN50-[200-600/1]
SASTA10-[50-250/1]
Part Number
Standard Unit Price
Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSSeparate/Set Item Post Type Post Hole Dia. D
(mm)
Bracket Surface Treatment Post Material Post Surface Treatment Post Thermal Treatment Dowel Holes BH (Big Hole Machining for Fine Adjustment) Sale Type L
(mm)

-

1 7 Days 10SetTubes25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set75 ~ 450

-

1 7 Days 10SetTubes30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set100 ~ 450

-

1 7 Days 10SetTubes35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set125 ~ 500

-

1 7 Days 10SetTubes40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set150 ~ 500

-

1 7 Days 10SetTubes50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set200 ~ 600

-

1 7 Days 10SetSolid20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set75 ~ 400

-

1 7 Days 10SetSolid25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set75 ~ 450

-

1 7 Days 10SetSolid30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set100 ~ 450

-

1 7 Days 10SetSolid35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set125 ~ 500

-

1 7 Days 10SetSolid40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set150 ~ 500

-

1 7 Days 10SetSolid50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedProvided-Set200 ~ 600

-

1 7 Days 10SetTubes10[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 250

-

1 7 Days 10SetTubes12[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 300

-

1 7 Days 10SetTubes15[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 350

-

1 7 Days 10SetTubes20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 400

-

1 7 Days 10SetTubes25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 450

-

1 7 Days 10SetTubes30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set100 ~ 450

-

1 7 Days 10SetTubes35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set125 ~ 500

-

1 7 Days 10SetTubes40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set150 ~ 500

-

1 7 Days 10SetTubes50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set200 ~ 600

-

1 7 Days 10SetTubes10Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 250

-

1 7 Days 10SetTubes12Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 300

-

1 7 Days 10SetTubes15Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 350

-

1 7 Days 10SetTubes20Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 400

-

1 7 Days 10SetTubes25Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 450

-

1 7 Days 10SetTubes30Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set100 ~ 450

-

1 7 Days 10SetTubes35Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set125 ~ 500

-

1 7 Days 10SetTubes40Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set150 ~ 500

-

1 7 Days 10SetTubes50Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set200 ~ 600

-

1 7 Days 10SetSolid10[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 250

-

1 7 Days 10SetSolid12[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 300

-

1 7 Days 10SetSolid15[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 350

-

1 7 Days 10SetSolid20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 400

-

1 7 Days 10SetSolid25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 450

-

1 7 Days 10SetSolid30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set100 ~ 450

-

1 7 Days 10SetSolid35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set125 ~ 500

-

1 7 Days 10SetSolid40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set150 ~ 500

-

1 7 Days 10SetSolid50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set200 ~ 600

-

1 7 Days 10SetSolid10Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 250

-

1 7 Days 10SetSolid12Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set50 ~ 300

-

1 7 Days 10SetSolid15Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 350

-

1 7 Days 10SetSolid20Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 400

-

1 7 Days 10SetSolid25Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set75 ~ 450

-

1 7 Days 10SetSolid30Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set100 ~ 450

-

1 7 Days 10SetSolid35Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set125 ~ 500

-

1 7 Days 10SetSolid40Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set150 ~ 500

-

1 7 Days 10SetSolid50Electroless Nickel PlatingEN 1.1191 Equiv.Electroless Nickel PlatingNot ProvidedNot Provided-Set200 ~ 600

-

1 7 Days 10SetTubes20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set75 ~ 400

-

1 7 Days 10SetTubes25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set75 ~ 450

-

1 7 Days 10SetTubes30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set100 ~ 450

-

1 7 Days 10SetTubes35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set125 ~ 500

-

1 7 Days 10SetTubes40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set150 ~ 500

-

1 7 Days 10SetTubes50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set200 ~ 600

-

1 7 Days 10SetSolid20[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set75 ~ 400

-

1 7 Days 10SetSolid25[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set75 ~ 450

-

1 7 Days 10SetSolid30[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set100 ~ 450

-

1 7 Days 10SetSolid35[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set125 ~ 500

-

1 7 Days 10SetSolid40[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set150 ~ 500

-

1 7 Days 10SetSolid50[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedProvided-Set200 ~ 600

-

1 7 Days 10SetTubes10[Black Oxide] Black oxide or Phosphate Conversion CoatEN 1.4301 Equiv.Not ProvidedNot ProvidedNot Provided-Set50 ~ 250

Loading...

Basic information

Mounting Direction Vertical Mount Type Stand Bracket Type Square Flanged Post Shape Round
Bracket Material EN-JL 1040 Equiv. Post Fixing Method Set Screw Mounting Hole Shape Counterbored Hole
Post Fixing Accessories Set Screw

Complementary Products

MISUMI Unit еxample related to this product

Tech Support