[NAAMS] Locating Pin APS Small Head (Part Numbers - CAD Download)

[NAAMS] Locating Pin APS Small Head
  • Volume Discount
• Shape: With Shoulder
• Head Shape: Round
• Feature: Hole -0.15
• Type: APS
• Shank Style: Standard / Screw Mount

Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

[NAAMS] Locating Pin APS Small Head:Related ImageHead Tip
Tip Shape Selection
A
Shape
Bullet[NAAMS] Locating Pin APS Small Head:Related Image
B
Shape
Half Bullet[NAAMS] Locating Pin APS Small Head:Related Image
C
Shape
Sphere[NAAMS] Locating Pin APS Small Head:Related Image
*Note 1: M2 pins are hardened through with a drawn shank.

 

Type[ S ]Surface Treatment[ M ]Material[ H ]Hardness
APSStandard NAAMSNone - Plain
T - TiN
EN 1.6523 Equiv.Carburized
58 ~ 62HRC
(Depth 0.5-0.7 after Grinding)
APSSA ConfigurableP - Plain
T - TiN
R - Rainbow DLC
M2APSStandard NAAMSNone - Plain
D - Rainbow DLC
EN 1.3343 Equiv.Through hardened 58-65 HRC
(with drawn shank >35 HRC)
M2APSSA ConfigurableP - Plain
R - Rainbow DLC


[ T ]Tolerance

DimensionTol.FinishGeometric
0.0±0.36.0μm[NAAMS] Locating Pin APS Small Head:Related Image0.015 T.I.R
to Datum A & B
0.00±0.033.0μm[NAAMS] Locating Pin APS Small Head:Related Image
0.000±0.0151.6μm[NAAMS] Locating Pin APS Small Head:Related Image0.03 T.I.R

 

Specifications

Standard NAAMS

Part Number
       
Type D DIA A Lead Length Coating
APS 08 4M  
APS 19 2M T
M2APS 08 4M  
M2APS 08 4M D


Configurable NAAMS

Part Number
        
Type Coating Tip Shape D Head Dia. A
APSS P B 16-A95
APSS T A 8-A25
M2APSS P C 16-A85
M2APSS R A 8-A30


Standard NAAMS

TypeD Head Dia
Callout (Actual)
A Lead LengthCoatingB RadC Rad
15 mm20 mm30 mm40 mm50 mm60 mm70 mm80 mm90 mm100 mm
APS
M2APS
(Hole - 0.15)
06 (5.85)1M2M 3M4M5M6M----None - Plain
T - TiN
(not available on M2 Pins)
D - Rainbow DLC
(Only for M2 Pins)
1.018.0
08 (7.85)1M2M3M4M5M6M7M8M--1.024.0
10 (9.85)1M2M3M4M5M6M7M8M9M0M2.030.0
12 (11.85)1M2M3M4M5M6M7M8M9M0M2.036.0
13 (12.85)1M2M3M4M5M6M7M8M9M0M2.039.0
16 (15.85)1M2M3M4M5M6M7M8M9M0M2.048.0
19 (18.85)1M2M3M4M5M6M7M8M9M0M2.038.0


Configurable NAAMS (A Configurable)

TypeCoatingTip ShapeD
Dia. Callout
A Lead Length
(1 mm Inc.)
B RadC Rad
Tip ATip BTip C
APSS
M2APSS
(Hole - 0.15)
P - Plain
T - TiN
(not available on M2 Pins)
R - Rainbow DLC
A
B
C
6 (5.85)10 ~ 601.018.09.0D/2
8 (7.85)10 ~ 8024.012.0D/2
10 (9.85)10 ~ 1002.030.015.0D/2
12 (11.85)36.018.0D/2
13 (12.85)39.019.5D/2
16 (15.85)48.024.0D/2
19 (18.85)38.019.0D/2

Part Number:  

    3D preview is not available, because the part number has not yet been determined.

  • In order to open the 3D preview, the part number must be fixed.
Loading...
Part Number
M2APSSPA19-A[10-100/1]
M2APSSPB6-A[10-60/1]
M2APSSPB8-A[10-80/1]
M2APSSPB10-A[10-100/1]
M2APSSPB12-A[10-100/1]
M2APSSPB13-A[10-100/1]
M2APSSPB16-A[10-100/1]
M2APSSPB19-A[10-100/1]
M2APSSPC6-A[10-60/1]
M2APSSPC8-A[10-80/1]
M2APSSPC10-A[10-100/1]
M2APSSPC12-A[10-100/1]
M2APSSPC13-A[10-100/1]
M2APSSPC16-A[10-100/1]
M2APSSPC19-A[10-100/1]
M2APSSRA6-A[10-60/1]
M2APSSRA8-A[10-80/1]
M2APSSRA10-A[10-100/1]
M2APSSRA12-A[10-100/1]
M2APSSRA13-A[10-100/1]
M2APSSRA16-A[10-100/1]
M2APSSRA19-A[10-100/1]
M2APSSRB6-A[10-60/1]
M2APSSRB8-A[10-80/1]
M2APSSRB10-A[10-100/1]
M2APSSRB12-A[10-100/1]
M2APSSRB13-A[10-100/1]
M2APSSRB16-A[10-100/1]
M2APSSRB19-A[10-100/1]
M2APSSRC6-A[10-60/1]
M2APSSRC8-A[10-80/1]
M2APSSRC10-A[10-100/1]
M2APSSRC12-A[10-100/1]
M2APSSRC13-A[10-100/1]
M2APSSRC16-A[10-100/1]
M2APSSRC19-A[10-100/1]
Part Number
Standard Unit Price
Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSHead Configurable Tip Shape Surface Treatment Head Size (Actual)
(mm)
A Lead Length
(mm)
Material

-

1 20 Days -A Lead ConfigurableBullet NosePlain19(18.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain6(5.85)10 ~ 60EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain8(7.85)10 ~ 80EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain10(9.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain12(11.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain13(12.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain16(15.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableHalf BulletPlain19(18.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain6(5.85)10 ~ 60EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain8(7.85)10 ~ 80EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain10(9.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain12(11.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain13(12.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain16(15.85)10 ~ 100EN 1.3343 Equiv.

-

1 20 Days -A Lead ConfigurableSpherePlain19(18.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC6(5.85)10 ~ 60EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC8(7.85)10 ~ 80EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC10(9.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC12(11.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC13(12.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC16(15.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableBullet NoseRainbow DLC19(18.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC6(5.85)10 ~ 60EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC8(7.85)10 ~ 80EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC10(9.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC12(11.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC13(12.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC16(15.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableHalf BulletRainbow DLC19(18.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC6(5.85)10 ~ 60EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC8(7.85)10 ~ 80EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC10(9.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC12(11.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC13(12.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC16(15.85)10 ~ 100EN 1.3343 Equiv.

-

1 26 Days -A Lead ConfigurableSphereRainbow DLC19(18.85)10 ~ 100EN 1.3343 Equiv.

Loading...

More Information

P/N Marking
[NAAMS] Locating Pin APS Small Head:Related Image

Basic information

Head Shape Round Hole (4 touching points) Shank Shape Screw Mount Type APS
Hole/Slot Dimension Hole -0.15 Basic Shape With Shoulder

Complementary Products

Tech Support