Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
CSPPN1-STH-M2-1.8
Part Number
|
---|
CSPPN1-STH-M2-1.8 |
Part Number |
Standard Unit Price
| Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | RoHS | Screw Nominal (M) | Length L (mm) | Material | Surface Treatment | |
---|---|---|---|---|---|---|---|---|---|---|
234.68 € | 10,000 Pieces Per Package | 1 pack | 14 Days | 10 | 2 | 1.8 | - | [Chrome Plating] Chrome Plated |
Loading...
Detailed Shape | Pan | Mounting Hole Shape | Phillips Head | Thread Type | Metric Coarse |
---|---|---|---|---|---|
Basic Shape | Standard (Round) | Sales Unit | Box/Package | Application | Standard |
This page is No. 0 Type 1 Phillips Pan Head Screw, part number CSPPN1-STH-M2-1.8.
You can find the detail information about specifications and dimensions on part number CSPPN1-STH-M2-1.8.
Configure
Basic Attributes
Material
Surface Treatment
Type
Screw Nominal (M)
Length L (mm)
Filter by CAD data type
Filter by standard shipping days
Optional Attributes
Part Number |
---|
CSPPN1-BRN-M1-3 |
CSPPN1-BRN-M1-3.5 |
CSPPN1-BRN-M1-4 |
CSPPN1-STH-M2-10 |
CSPPN1-STH-M2-11 |
CSPPN1-STH-M2-12 |
Part Number | Standard Unit Price | Number of pc(s). included in pkg. | Minimum order quantity | Volume Discount | Standard Shipping Days ? | RoHS | Screw Nominal (M) | Length L (mm) | Material | Surface Treatment |
---|---|---|---|---|---|---|---|---|---|---|
159.70 € | 5,000 Pieces Per Package | 1 pack | 6 Days | 10 | 1 | 3 | Brass | [Nickel Plating] Nickel Plating | ||
167.05 € | 5,000 Pieces Per Package | 1 pack | 14 Days | 10 | 1 | 3.5 | Brass | [Nickel Plating] Nickel Plating | ||
159.70 € | 5,000 Pieces Per Package | 1 pack | 6 Days | 10 | 1 | 4 | Brass | [Nickel Plating] Nickel Plating | ||
140.10 € | 5,000 Pieces Per Package | 1 pack | 6 Days | 10 | 2 | 10 | - | [Chrome Plating] Chrome Plated | ||
153.13 € | 5,000 Pieces Per Package | 1 pack | 14 Days | 10 | 2 | 11 | - | [Chrome Plating] Chrome Plated | ||
113.93 € | 4,000 Pieces Per Package | 1 pack | 14 Days | 10 | 2 | 12 | - | [Chrome Plating] Chrome Plated |