Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | blade diameter D (mm) | Finish category | Number of flutes (sheet) | Maximum Cutting Depth (Ad) (mm) | Underneck length (ℓ1) (mm) | Maximum Engine Speed n max | Dimensions D 5m (mm) | Mass (kg) | Specifications | Tip Size (mm) | Blade distribution | Program Length (mm) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
622.95 € | 1 | 8 Days | 25 | Rough and medium rough processing | 3 | 5.5 | 60 | 40,400 | 32 | 0.3 | Cross pitch (medium number of blades) | 8 | Equal division | 80 | ||
622.95 € | 1 | 8 Days | 25 | Rough and medium rough processing | 3 | 5.5 | 45 | 39,000 | 40 | 0.4 | Cross pitch (medium number of blades) | 8 | Equal division | 70 | ||
622.95 € | 1 | 8 Days | 25 | Rough and medium rough processing | 3 | 5.5 | 50 | 28,000 | 50 | 0.6 | Cross pitch (medium number of blades) | 8 | Equal division | 75 | ||
622.95 € | 1 | 8 Days | 25 | Rough and medium rough processing | 3 | 5.5 | 53 | 20,000 | 63 | 1 | Cross pitch (medium number of blades) | 8 | Equal division | 80 | ||
735.37 € | 1 | 6 Days | 32 | Rough and medium rough processing | 4 | 5.5 | 60 | 33,900 | 32 | 0.4 | Cross pitch (medium number of blades) | 8 | Equal division | 80 | ||
735.37 € | 1 | 8 Days | 32 | Rough and medium rough processing | 4 | 5.5 | 45 | 33,900 | 40 | 0.5 | Cross pitch (medium number of blades) | 8 | Equal division | 70 | ||
735.37 € | 1 | 6 Days | 32 | Rough and medium rough processing | 4 | 5.5 | 50 | 28,000 | 50 | 0.7 | Cross pitch (medium number of blades) | 8 | Equal division | 75 | ||
735.37 € | 1 | 6 Days | 32 | Rough and medium rough processing | 4 | 5.5 | 53 | 20,000 | 63 | 1 | Cross pitch (medium number of blades) | 8 | Equal division | 80 | ||
735.37 € | 1 | 6 Days | 80 | Rough and medium rough processing | 4 | 5.5 | 30 | 31,300 | 32 | 0.3 | Cross pitch (medium number of blades) | 8 | Unequal division | 50 | ||
847.78 € | 1 | 6 Days | 40 | Rough and medium rough processing | 6 | 5.5 | 45 | 29,300 | 40 | 0.6 | Extra-cross pitch (large number of blades) | 8 | Equal division | 70 | ||
748.12 € | 1 | 6 Days | 40 | Rough and medium rough processing | 4 | 5.5 | 45 | 29,300 | 40 | 0.6 | Cross pitch (medium number of blades) | 8 | Unequal division | 70 | ||
799.11 € | 1 | 6 Days | 40 | Rough and medium rough processing | 4 | 10 | 45 | 26,400 | 40 | 0.5 | Extra-cross pitch (large number of blades) | 14 | Equal division | 70 | ||
683.21 € | 1 | 6 Days | 44 | Rough and medium rough processing | 3 | 10 | 45 | 26,400 | 40 | 0.5 | Cross pitch (medium number of blades) | 14 | Unequal division | 70 | ||
847.78 € | 1 | 6 Days | 44 | Rough and medium rough processing | 6 | 5.5 | 50 | 28,000 | 50 | 0.8 | Extra-cross pitch (large number of blades) | 8 | Equal division | 75 | ||
748.12 € | 1 | 8 Days | 44 | Rough and medium rough processing | 4 | 5.5 | 50 | 28,000 | 50 | 0.8 | Cross pitch (medium number of blades) | 8 | Unequal division | 75 | ||
799.11 € | 1 | 6 Days | 44 | Rough and medium rough processing | 4 | 10 | 50 | 26,400 | 50 | 0.8 | Extra-cross pitch (large number of blades) | 14 | Equal division | 75 | ||
683.21 € | 1 | 6 Days | 50 | Rough and medium rough processing | 3 | 10 | 50 | 26,400 | 50 | 0.8 | Cross pitch (medium number of blades) | 14 | Unequal division | 75 | ||
847.78 € | 1 | 6 Days | 50 | Rough and medium rough processing | 6 | 5.5 | 53 | 20,000 | 63 | 1.2 | Extra-cross pitch (large number of blades) | 8 | Equal division | 80 | ||
799.11 € | 1 | 6 Days | 50 | Rough and medium rough processing | 4 | 10 | 53 | 20,000 | 63 | 1.2 | Extra-cross pitch (large number of blades) | 14 | Equal division | 80 | ||
683.21 € | 1 | 8 Days | 50 | Rough and medium rough processing | 3 | 10 | 53 | 20,000 | 63 | 1.2 | Cross pitch (medium number of blades) | 14 | Unequal division | 80 | ||
847.78 € | 1 | 6 Days | 100 | Rough and medium rough processing | 6 | 5.5 | 40 | 27,600 | 40 | 0.6 | Extra-cross pitch (large number of blades) | 8 | Equal division | 60 | ||
797.95 € | 1 | 6 Days | 50 | Rough and medium rough processing | 5 | 5.5 | 40 | 27,600 | 40 | 0.6 | Cross pitch (medium number of blades) | 8 | Unequal division | 60 | ||
799.11 € | 1 | 8 Days | 50 | Rough and medium rough processing | 4 | 10 | 70 | 24,600 | 40 | 0.6 | Extra-cross pitch (large number of blades) | 14 | Equal division | 70 | ||
683.21 € | 1 | 6 Days | 50 | Rough and medium rough processing | 3 | 10 | 70 | 24,600 | 40 | 0.6 | Cross pitch (medium number of blades) | 14 | Unequal division | 70 | ||
1,052.90 € | 1 | 6 Days | 100 | Rough and medium rough processing | 7 | 5.5 | 50 | 25,500 | 50 | 1 | Extra-cross pitch (large number of blades) | 8 | Equal division | 75 | ||
953.24 € | 1 | 8 Days | 54 | Rough and medium rough processing | 5 | 5.5 | 50 | 25,500 | 50 | 1 | Cross pitch (medium number of blades) | 8 | Unequal division | 75 | ||
1,003.08 € | 1 | 8 Days | 54 | Rough and medium rough processing | 5 | 10 | 50 | 22,400 | 50 | 1 | Extra-cross pitch (large number of blades) | 14 | Equal division | 75 | ||
886.03 € | 1 | 6 Days | 54 | Rough and medium rough processing | 4 | 10 | 50 | 13,700 | 50 | 1 | Cross pitch (medium number of blades) | 14 | Unequal division | 75 | ||
1,052.90 € | 1 | 6 Days | 63 | Rough and medium rough processing | 7 | 5.5 | 53 | 20,000 | 63 | 1.4 | Extra-cross pitch (large number of blades) | 8 | Equal division | 80 | ||
953.24 € | 1 | 8 Days | 63 | Rough and medium rough processing | 5 | 5.5 | 53 | 20,000 | 63 | 1.4 | Cross pitch (medium number of blades) | 8 | Unequal division | 80 | ||
1,003.08 € | 1 | 6 Days | 63 | Rough and medium rough processing | 5 | 10 | 53 | 20,000 | 63 | 1.4 | Extra-cross pitch (large number of blades) | 14 | Equal division | 80 | ||
886.03 € | 1 | 6 Days | 63 | Rough and medium rough processing | 4 | 10 | 53 | 13,700 | 63 | 1.4 | Cross pitch (medium number of blades) | 14 | Unequal division | 80 | ||
1,052.90 € | 1 | 6 Days | 66 | Rough and medium rough processing | 7 | 5.5 | 40 | 24,300 | 50 | 0.9 | Extra-cross pitch (large number of blades) | 8 | Equal division | 60 | ||
953.24 € | 1 | 6 Days | 66 | Rough and medium rough processing | 5 | 5.5 | 40 | 24,300 | 50 | 0.9 | Cross pitch (medium number of blades) | 8 | Unequal division | 60 | ||
1,003.08 € | 1 | 6 Days | 66 | Rough and medium rough processing | 5 | 10 | 60 | 21,300 | 50 | 0.9 | Extra-cross pitch (large number of blades) | 14 | Equal division | 60 | ||
886.03 € | 1 | 6 Days | 80 | Rough and medium rough processing | 4 | 10 | 60 | 13,000 | 50 | 0.9 | Cross pitch (medium number of blades) | 14 | Unequal division | 60 | ||
1,240.65 € | 1 | 6 Days | 80 | Rough and medium rough processing | 8 | 5.5 | 23 | 20,000 | 63 | 1.2 | Extra-cross pitch (large number of blades) | 8 | Equal division | 50 | ||
1,139.82 € | 1 | 8 Days | 80 | Rough and medium rough processing | 6 | 5.5 | 23 | 20,000 | 63 | 1.2 | Cross pitch (medium number of blades) | 8 | Unequal division | 50 | ||
1,205.88 € | 1 | 6 Days | 80 | Rough and medium rough processing | 6 | 10 | 53 | 11,700 | 63 | 1.8 | Extra-cross pitch (large number of blades) | 14 | Equal division | 80 | ||
1,089.99 € | 1 | 6 Days | 80 | Rough and medium rough processing | 5 | 10 | 53 | 11,700 | 63 | 1.8 | Cross pitch (medium number of blades) | 14 | Unequal division | 80 | ||
1,240.65 € | 1 | 8 Days | 84 | Rough and medium rough processing | 8 | 5.5 | 28 | 20,000 | 63 | 1.3 | Extra-cross pitch (large number of blades) | 8 | Unequal division | 50 | ||
1,139.82 € | 1 | 6 Days | 84 | Rough and medium rough processing | 6 | 5.5 | 28 | 20,000 | 63 | 1.3 | Cross pitch (medium number of blades) | 8 | Unequal division | 50 | ||
1,205.88 € | 1 | 6 Days | 84 | Rough and medium rough processing | 6 | 10 | 65 | 11,400 | 63 | 1.5 | Extra-cross pitch (large number of blades) | 14 | Equal division | 65 | ||
1,089.99 € | 1 | 8 Days | 36 | Rough and medium rough processing | 5 | 10 | 65 | 11,400 | 63 | 1.5 | Cross pitch (medium number of blades) | 14 | Unequal division | 65 | ||
1,449.25 € | 1 | 6 Days | 40 | Rough and medium rough processing | 8 | 10 | 65 | 10,100 | 63 | 1.9 | Extra-cross pitch (large number of blades) | 14 | Equal division | 65 | ||
1,217.47 € | 1 | 8 Days | 40 | Rough and medium rough processing | 6 | 10 | 65 | 10,100 | 63 | 1.9 | Cross pitch (medium number of blades) | 14 | Unequal division | 65 | ||
1,599.91 € | 1 | 6 Days | 40 | Rough and medium rough processing | 10 | 5.5 | 45 | 14,000 | 80 | 3.4 | Extra-cross pitch (large number of blades) | 8 | Unequal division | 80 | ||
1,373.48 € | 1 | 6 Days | 40 | Rough and medium rough processing | 8 | 5.5 | 45 | 14,000 | 80 | 3.4 | Cross pitch (medium number of blades) | 8 | Unequal division | 80 | ||
1,449.25 € | 1 | 6 Days | 40 | Rough and medium rough processing | 8 | 10 | 45 | 10,100 | 80 | 3.2 | Extra-cross pitch (large number of blades) | 14 | Equal division | 80 | ||
1,217.47 € | 1 | 6 Days | 40 | Rough and medium rough processing | 6 | 10 | 45 | 10,100 | 80 | 3.2 | Cross pitch (medium number of blades) | 14 | Unequal division | 80 | ||
1,596.43 € | 1 | 6 Days | 40 | Rough and medium rough processing | 10 | 5.5 | 30 | 14,000 | 80 | 2.7 | Extra-cross pitch (large number of blades) | 8 | Unequal division | 60 | ||
1,373.48 € | 1 | 6 Days | 40 | Rough and medium rough processing | 8 | 5.5 | 30 | 14,000 | 80 | 2.7 | Cross pitch (medium number of blades) | 8 | Unequal division | 60 | ||
1,449.25 € | 1 | 8 Days | 40 | Rough and medium rough processing | 8 | 10 | 70 | 9,800 | 80 | 3 | Extra-cross pitch (large number of blades) | 14 | Equal division | 70 | ||
1,217.47 € | 1 | 6 Days | 40 | Rough and medium rough processing | 6 | 10 | 70 | 9,800 | 80 | 3 | Cross pitch (medium number of blades) | 14 | Unequal division | 70 |
Loading...
Machining Application | Plane / Side / Groove | work material | General Steel / Quenched and tempered steel / High Hardness Steel / Stainless Steel / Cast Iron / Aluminum / Titanium / Copper / Graphite / Resin | Mounting Method | Centering Plug |
---|---|---|---|---|---|
Details Type | Coromant Capto | Coolant | Coolant center-through |
Configure
Basic Attributes
blade diameter D(mm)
Number of flutes(sheet)
Maximum Cutting Depth (Ad)(mm)
Underneck length (ℓ1)(mm)
Maximum Engine Speed n max
Dimensions D 5m(mm)
Mass(kg)
Type
Finish category
Filter by standard shipping days
Optional Attributes